Surveying in construction: setting out, checks and as-built survey

An error in the position of the foundations can later cause problems with the building line or with registration. That is why survey checks are carried out during the stages of construction, not only once the building is finished.

The surveyor through the stages of construction

Stage Surveyor's job Why
Before the design Cadastral-topographic base map The design fits the site
Start of works Setting out (staking out) the building and the building line The building is where the design and the permit say it should be
Excavation Calculating cut and fill volumes Accurate settlement of accounts with the contractor
Foundations and structure Checking foundations, columns, verticality Errors are corrected while it is still cheap
During and after construction Monitoring building settlement Early detection of problems
Completion As-built survey and survey report Occupancy permit and cadastre registration
Surveyor with a total station setting out foundation axes on a construction site

What matters to developers and contractors

  • Contract survey monitoring for the whole building — one surveyor handles all measurements.
  • Ask for setting-out and inspection records — you will need them for the technical inspection.
  • Plan the as-built survey right after completion — it speeds up unit division and the sale of flats.

Unit division after construction

Send a request

Send a request to a surveyor

Free and without obligation. Surveyors working in the selected municipality receive your request.